PROJECT DESCRIPTION
The work involved the construction of a new widened steel framed pedestrian footway and the removal of existing structure and associated works as detailed below:
- The removal of existing pedestrian lock gate walkway.
- The construction of an increased width lock gate walkway and feeder ramps